Electrical infrastructure for a 20 MW industrial facility in Portuguesa

This case reflects the founding team’s prior experience, gained outside Orinoco Energy Solutions. It is not an Orinoco corporate contract.

Orinoco’s founding team took part in the electrical infrastructure of a 20 MW industrial facility in Portuguesa state. The scope covered the 13.8 kV feeder, transformation to 480 V and the site’s low-voltage distribution.

Key data

LocationPortuguesa state, Venezuela
Site capacity20 MW (facility capacity, not installed generation)
Medium voltage13.8 kV feeder
Low voltageTransformation to 480 V and distribution

Described scope

Feeder
Dedicated at 13.8 kV, interconnected to the substation.
Transformation
Power 13.8 kV → 480 V.
Distribution
Main panels and low-voltage systems.
Infrastructure
Industrial grounding and full commissioning.

This case is one of the 8 energized facilities the team took part in, across five Venezuelan states.

Contact

Let’s discuss your electrical infrastructure.

Share the location, assets or systems involved, required scope and target date. For maintenance, please include site access conditions and the available work window.

info@orinocoenergy.net Orinoco Energy Solutions, C.A. · Venezuela

Infrastructure for operations that cannot stop.